Solar Pump Installation Report
Back to Completed Projects
COUNTRY: overseas
Australia - Rockhampton
INSTALLATION DATE
SEPTEMBER 2025

Technical Highlights
Dual-hybrid helical rotor pump installed to lift water to cliff-top storage where the local electrical grid was unstable.
System Model
Roto Rudra RSSH 2.5-C
Power
900 W Solar
Head
93 Meter Head
Flow Required
15,000 LPD Flow
Scope of Work & Installation Details
The installation focused on providing an optimized pumping solution tailored to the specific site requirements. Given the region's specific needs for steady water delivery and energy reliability, the Roto Rudra RSSH 2.5-C was selected and deployed successfully.
Key technical milestones and outcomes achieved for this project include:
- Water delivered to elevated storage tanks
- Solar plus grid/generator backup
- High-head pumping solved site challenge
- Secured daily water availability
Roto Energy is pleased to report that the system is operating effectively, demonstrating the product's versatility and robust design.