Top Solar Pumps
UPCOMING EXHIBITION!Event : (NGWA) Groundwater Week 2026Venue : Las Vegas Convention Center (LVCC)Stall No. : 1725Date : 8–10, December 2026
Solar Pump Installation Report

Solar Pump Installation Report

Back to Completed Projects
COUNTRY: india

Indore Construction Water Supply Project

STATE: madhya pradesh
INSTALLATION DATE
10TH APRIL 2026
Indore Construction Water Supply Project

Technical Highlights

Surface helical pump deployed for construction water supply, including lifting water to upper floors for curing work.

System Model
Roto Rudra RSFH 1.8-A
Power
500 W Power
Head
30 Meter Head
Flow Required
42 LPM Flow

Scope of Work & Installation Details

The installation focused on providing an optimized pumping solution tailored to the specific site requirements. Given the region's specific needs for steady water delivery and energy reliability, the Roto Rudra RSFH 1.8-A was selected and deployed successfully.

Key technical milestones and outcomes achieved for this project include:

  • Reliable construction site water supply
  • Remote mini-controller installation
  • Flexible surface-mounted setup
  • Steady 42 LPM delivery

Roto Energy is pleased to report that the system is operating effectively, demonstrating the product's versatility and robust design.