Solar Pump Installation Report
Back to Completed Projects
COUNTRY: overseas
Kathmandu Community Water Supply Project
INSTALLATION DATE
OCTOBER 2024

Technical Highlights
High-head solar helical pumping system installed to move water from a lower collection tank to hillside community storage.
System Model
Roto Rudra RSSH 1.4-D
Power
1500 Wp Solar Array
Head
200 Meter Head
Flow Required
7,000 LPD Flow
Scope of Work & Installation Details
The installation focused on providing an optimized pumping solution tailored to the specific site requirements. Given the region's specific needs for steady water delivery and energy reliability, the Roto Rudra RSSH 1.4-D was selected and deployed successfully.
Key technical milestones and outcomes achieved for this project include:
- 200 meter vertical lift achieved
- 7,000 LPD community supply
- Reduced dependence on costly alternatives
- Improved hillside water access
Roto Energy is pleased to report that the system is operating effectively, demonstrating the product's versatility and robust design.