
Solar Pump Installation Report
Back to Completed Projects
COUNTRY: india
Telangana
STATE: telangana
INSTALLATION DATE
20TH-24TH MAY 2026

Technical Highlights
Multi-day site visit covering pump inspection, fault diagnosis, restoration work, controller validation, and field training.
System Model
Roto Rudra RSSH 2.0-D
Application
Bayma2 Engineering Sites
Depth
400 Feet Depth
Flow Required
15,000 LPD Discharge
Scope of Work & Installation Details
The installation focused on providing an optimized pumping solution tailored to the specific site requirements. Given the region's specific needs for steady water delivery and energy reliability, the Roto Rudra RSSH 2.0-D was selected and deployed successfully.
Key technical milestones and outcomes achieved for this project include:
- Pump inspection across multiple Telangana sites
- Fault diagnosis and restoration support
- Controller settings validated
- Field training at Bayma2 workshop
Roto Energy is pleased to report that the system is operating effectively, demonstrating the product's versatility and robust design.
